
F1 75 LIVE AT THE 02
The Next Stage manufactured a huge mainstage structure for F1 75 Live At The O2.
This 55m long beast had to be built in two halves in order to fit into the workshop.
The whole floor of the stage was LED video tiles, to make sure these all went down and located correctly, special frames had to be made to give the correct location holes for the product.
A lighting shelf was integrated around the stage to give a space to place many more lights which were used to great effect by the teams when introducing themselves and new car liveries.
To help with a fast load in the whole stage structure was built to roll into place once the huge video and lighting trusses were hoisted up form the centre of the arena.
Of course, all of the cars needed to get out onto the stage, here we collaborated with Video Design to produce a doorway in the upstage video wall.
Our talented team pulled out all the stops to deliver the project on time, echoing the work ethic of the F1 teams that were front and centre on the night.
It has been an honour to be a part of such a stunning production







